Gallery
- PM Modi visit USAOnly the mirror in my washroom and phone gallery see the crazy me : Sara KhanKarnataka rain fury: Photos of flooded streets, uprooted treesCannes 2022: Deepika Padukone stuns at the French Riviera in Sabyasachi outfitRanbir Kapoor And Alia Bhatt's Wedding Pics - Sealed With A KissOscars 2022: Every Academy Award WinnerShane Warne (1969-2022): Australian cricket legend's life in picturesPhotos: What Russia's invasion of Ukraine looks like on the groundLata Mangeshkar (1929-2022): A pictorial tribute to the 'Nightingale of India'PM Modi unveils 216-feet tall Statue of Equality in Hyderabad (PHOTOS)
Freya Deshmane riding on Reinroe Adare Acrobat claimed the top spot and clinched the gold
- Salah sets Premier League record in Liverpool's draw at Newcastle
- India Open Competition in Shotgun begins in Jaipur, paving way for Nationals' qualification
- Hockey India names Amir Ali-led 20-man team for Junior Asia Cup
- Harmanpreet Singh named FIH Player of the Year, PR Sreejesh gets best goalkeeper award
- World Boxing medallist Gaurav Bidhuri to flag off 'Delhi Against Drugs' movement on Nov 17
NHSRCL to study 7 new Bullet Train corridors totalling 5,000 km Last Updated : 02 Sep 2020 04:35:50 PM IST Bullet train (file pic) Even as the National High Speed Rail Corporation (NHSRCL) is working on the construction of the 508 km-long Ahmedabad-Mumbai high speed train or Bullet Train project, the agency is also holding studies for 5,000 km long seven new routes across the country.
According to senior NHSRCL officials, the agency has been assigned by the Railway Ministry to study the proposed seven new high speed corridors.The official said NHSRCL has been entrusted by the Ministry of Railways to prepare Detailed Project Reports (DPR) for the 865 km Delhi-Varanasi, 753 km Mumbai-Nagpur, 886 km Delhi-Ahmedabad, 435 km Chennai-Mysore, 459 km Delhi-Amritsar, 711 km Mumbai-Hyderabad and 760 km Varanasi-Howrah new proposed corridors.The official said that the NHSRCL is collecting data on the seven new proposed corridors for the preparation of the DPRs. The NHSRCL is currently constructing the Mumbai Ahmedabad High Speed rail project.Prime Minister Narendra Modi and his Japanese counterpart Shinzo Abe on September 14, 2017 laid the foundation stone of the ambitious Rs 1.08 lakh crore ($17 billion) project.The Japan International Cooperation Agency (JICA) and the Union Railway Ministry have inked a memorandum of understanding (MoU) for the 508-km corridor, with Japan to partially fund the project. According to NHSRCL a total of 1,380 hectare land is required for the high speed train project, out of which the Railways have acquired 479 hectare from private persons and 119 hectare from government land.The NHSRCL is set to complete the 508-km corridor project before its deadline of December 2023. According to the official, a 21 km-long tunnel will be dug between Boisar and BKC in Mumbai, seven km of which will be under the sea.According to the NHSRCL official, the tender for the design and construction of civil and building works, including testing and commissioning of 237 km length of the mainline out of the elevated 460 kms has been floated. The mainline also has one mountain tunnel of about 280 metre, 24 river crossings and 30 road and canal crossings.The Bullet Trains are expected to run at 350 km per hour covering the 508 km stretch in about two hours. In comparison, trains currently plying on the route take over seven hours to travel the distance, whereas flights take about an hour.IANS New Delhi For Latest Updates Please-
Join us on
Follow us on
172.31.16.186